INDUSTRY · MACHINERY & PLANT ENGINEERING

Customer requirements, product variants, and compliance
in one context.

In a complex customer inquiry, technical project requirements, product standards, and regulatory requirements come together, and technical sales, engineering, and service assess them jointly. DECOTA connects that information and shows which requirements an existing variant meets, where a modification is needed, and where a development task arises.

Machinery and plant engineering: assembly system on the shop floor
SPECIFICATION_PLANT-B.PDF · PAGE 112 · TAB. 8 · TECHNICAL PARAMETER

"Overall plant availability of at least 98.5 percent in three-shift operation." Captured as a requirement, checked against your portfolio, and linked to its source passage.

WHY NOW

Why technical requirements deserve closer attention

Three developments are hitting machinery and plant engineering at once, changing how much effort a dependable bid decision takes.

Inquiries keep getting more detailed

Speeds, tolerances, interfaces, and availability figures are spread by the hundreds across chapters, appendices, and data sheets. Today they are mostly transcribed into comparison spreadsheets by hand, which severs the link to the source passage.

Effort per bid matters

Flat demand and global competition meet bids that shuttle back and forth between sales and engineering. Recurring questions about design and availability sit in inboxes while the deadline runs down.

Keep hard-won experience available

Which design has proven itself and where the edge cases lie is knowledge held by a few experienced colleagues. When they leave the company, assessing similar inquiries starts from scratch again.

AN ILLUSTRATIVE PROCESS

From customer specification to plant proposal

Sales, engineering, and procurement bring customer requirements, product knowledge, and supplier information together into one aligned proposal.

01

Review the inquiry and gauge the effort

Sales receives the customer specification, attachments, and delivery terms by email or through a customer portal. Together with the technical departments, they judge whether the inquiry is technically and commercially attractive and can be handled with the capacity available.

02

Transcribe requirements into working lists

Each department reads the documents from its own perspective. Technical requirements, commercial terms, and required evidence are transferred into spreadsheets or comment lists. The different working versions then have to be merged.

03

Review existing solutions and modifications

Engineering compares the requirements against product data, existing configurations, and earlier projects. Open questions are discussed with colleagues and with the customer. Results and changes have to be fed back into the respective lists.

04

Involve suppliers and determine costs

Procurement compiles documents for purchased assemblies and requests quotes. In parallel, engineering assesses the modifications required. Responses, deviations, costs, and lead times feed into the overall calculation.

05

Release the proposal and hand over the project

Scope, exceptions, and commitments are aligned and released. Changes from negotiations are carried forward. If the order is won, project execution takes over the documents and needs a traceable record of the agreed requirements.

Keeping the overview depends on lists, meeting outcomes, and technical assessments staying current across everyone involved.

WITH DECOTA

What improves for your team

UNDERSTAND

Spot requirements and contradictions earlier

DECOTA captures the technical requirements from the customer specification, the attachments, and the data sheets and links each one to its source passage. Your team sees contradictory figures and open items before anything is priced.

CHECK

Reuse reviewed assessments

For every requirement, DECOTA finds similar requirements from earlier inquiries along with the assessment made at the time. Proven designs stay documented in-house, even when experienced colleagues leave.

MATCH

Turn requirements into a structured response

The assessed requirements form the basis for the functional specification, which is produced directly from the case. If a requirement changes during a clarification meeting, the link within the document is preserved.

MORE RELEVANT USE CASES Create supplier requirements→ Review guideline changes→ Assess existing products→

FOR DECISION MAKERS, IN SHORT

Your engineering team gains time for new solutions. Existing configurations and earlier assessments help resolve technical questions faster. Sales and estimating see sooner which requirements are met and where modifications will be needed.

Frequently asked questions

How does DECOTA support the transition to the EU Machinery Regulation?

DECOTA supports comparing stored specifications against documented requirements and product revisions. Your team can trace which open inquiries or products are linked to a changed specification and which assessments need review. Which requirements actually apply, and what action is needed, is determined by the responsible department.

Our proposals combine machine, options, and service. Can that be represented?

Yes. Service and maintenance scopes are captured in the knowledge base like product attributes and checked against the requirements of each inquiry. That shows which part of the scope covers a given requirement.

We purchase assemblies externally. Does DECOTA help with supplier requirements?

From the assessed requirements you compile a package for a trade or an assembly whose items point back to the customer inquiry. You assign the responses to the individual requirements. Sending it out runs through your existing channels.

Where can DECOTA take pressure off your team

In a first 30-minute conversation we learn how you work today, examine where DECOTA fits, and assess together what value it can deliver for your team.

Schedule a conversation